Cooke 3 _ Backfill Plant
- Concrete Structures Demolition _ Load
Haul and Dispose (Radiative Material)
- Backfill Plant – Rehab
Middelvlei Pits Rehab project
Charonamix Mining (Pty) Ltd was offered an opportunity by Sibanye Stillwater Limited to provide a remedy to the Old Cooke 3 Backfill plant surface area that is immensely affected by historical spillage of hazardous, radioactive backfill material over the years.
- Demolition of all steel reinforced slab (width ± 300mm)
- Demolition of all steel reinforced concrete Pillars and partitioning
- Demolition of the old concrete sludge dams and pipeline concrete support
Cooke 3 BFP - Load & Haul
Rip, dig out, load & haul of all concrete material as well as the radioactive spillage area (surface) and dispose of to the designated Landfill site in
ABOUT US
Mine Rehabilitation, Mining, Metallurgical Engineering, Mine Evaluation, Mineral Accounting, Geology, Health, Safety & Environmental Sciences, Security, Consulting, and Studies
(c) 2020 All Rights Reserved.Charonamix Mining
SOCIAL
- Randfontein, Gauteng 1759, ZA
- +27 11 415 2309
- +27 78 130 2315
- info@charonamixminings.co.za